Installation note:
1. Due to the different ceilings days Shed (such as ordinary wood, solid wood, lime plaster board, lime cement coating, synthetic ceiling papaya, etc.) by the force of circumstances, some cases require the use of screws lamps.
2. Due to lighting heavier than the time of installation, according to the hardness of the forces and ceiling expansion screws bolt purchase or lengthened reinforcement screws, install the corresponding force screws.
3.LED ceiling belong to electronic products, the installation must have experience and relevant documents requested professional electrician to help assist in the installation, in order to avoid unnecessary accidents. Then with the money first thing to try is powered LED ceiling light, it will light.
Certainly before the entire circuit 4. Install LED ceiling inspection in order to avoid leakage, resulting in personal safety, before installation to find a professional electrician to install, do not secretly installed.
5. Ensure that the lamp operating voltage before to make sure the lamp is powered lamp operating voltage is correct, misconnection voltage can cause permanent damage to the lamp.
6. Install LED ceiling should be avoided in the heat and hot steam, corrosive gases, so as not to affect life expectancy.
7. Before installation remember to turn off the power, turn off the switch, while also prevent electric shock, before installation check the installation hole size to meet the requirements at the same time check the terminals and the power input cable is securely connected, if loose, please be locked again operation, or it may not result in normal lighting fixtures; check whether the installation of lighting and flat surface lamination, if slits please make appropriate adjustments.
8. Select the installation site in no vibration, no swing, no fire hazards open place, avoid high-altitude drops, hard object collision, percussion. Long-term NA placed in a dry ventilated place! Cabling should be followed by the electrical equipment to the end by far to near laying distribution room, using fire-retardant sealing material is sealed at the cable orifice tube. Use between the motor, field operations and other electrical equipment and cable column pipe explosion-proof flexible connection pipe connection, please refer to the purchase of other fixtures attached installation instructions, refer to the manual for installation use.